You are here: Home / Community Assets Search / DMCC approves $22M in capitral improvement projects for 2018

DMCC approves $22M in capitral improvement projects for 2018

 
Public Report on Destination Medical Center (DMC) led by DMC EDA
Last modified: November 04, 2017

Contents

Highlights


 

While the DMC EDA budget will rise from $3.5 million this year to more than $3.7 million next year, the city will contribute $122,000 less and Mayo Clinic's contribution will increase by $337,000.

Contents


Per PB 

Work is planned on 31 projects in 2018, but not all have received final approval.

 

"Most of them are non-sexy projects, but they need to be done to make changes coming to Discovery Square, the Titan project and all these things happening," board Treasurer Jim Bier said.

Rani, who is stepping down from the board, said the work being done will build capacity for future development.

Rochester Assistant City Administrator Gary Neumann said that's why the city is moving up some projects by using an added $3.35 million in city utility funds and avoiding future upgrades.

"We're doing some lines that will create capacity for all of Discovery Square and some of the other areas," he said. "In those cases, we would have been doing these many years in the future."

Also included in the capital-improvement plan is $6.35 million slated for transit and transportation projects, and nearly $3.6 million intended for other public realm projects, including redesign efforts in various subdistricts.

While 12 of the identified 31 capital-improvement projects are ready to start, eight will still require final DMCC board and city approvals. They include transportation projects, street redesigns and the Chateau Theatre project.

Another 11 items on the list, including Heart of the City design efforts and the city's new parking ramp, have started and didn't require new action Thursday.

Funding divide

Of the approximately $18.9 million in DMC resources being used for capital improvement efforts, the majority — $8.7 million — will eventually come from state funds. So far, only $2.67 million in state money has been received, but the remaining funds will be borrowed based on future payments.

A planned $585 million in public funding over 20 years is expected to come from five sources:

• $327 million in state aid

• $128 million in city funds

• $69.6 million in state transit funds

• $46.4 million in county transit funds

• $14 million from the local sales tax exemption

The state funding required $200 million in private investments before any funds were released. The DMC initiative achieved that level of investment last year, and $2.67 million was released as a percentage over the $200 million in investment.

"The state government is not giving us money until the metrics are met," Bier said, noting the delayed funding makes the DMC project unusual.

 


 

Impact Levels

  Impact Lvl 1: Arts & Culture ; Economic Development ; Transportation ; Vision/Identity

 

Back to TOC

 


 

 


 

 

  

 

Related Reports


 

Other Destination Medical Center (DMC) Pinned Reports


May 24, 2024 : 1H 2024 Destination Medical Center
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

Proceedings

May 2024 DMCC Board Meeting and City, County, DMC Joint Meeting

Feb 2024 DMCC Board Meeting



February 12, 2024 : Destination Medical Center (DMC) Investment Metrics Slow Down Trend
Impact Lvl1: Biotec, Business Process, Economic Development, Housing, Metrics, Sustainability
Impact Lvl2:

Feb 1, 2024 DMCC Board Meeting

Private investment metrics Slide

Video Clip

PB Reporting



December 13, 2023 : 2H 2023 Destination Medical Center (DMC) Meeting Informaiton
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

November DMCC Meeting Info 

September DMCC Meeting Info

May DMCC Meeting Info 



October 01, 2023 : Destination Medical Center 3Q 2023 Reports
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

1. September 2023 DMCC Board Meeting:

2. Meeting Package,

3. Meeting Slides,

4. Video Recording 

5. Breakouts



March 23, 2023 : 1Q 2023 Destination Medical Center (DMC) Reports
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

March 2023 Executive Committee Meeting;

Feb 9 2023 DMCC Board Meeting and City, County, DMC Collaborative Session



November 12, 2022 : Destination Medical Center (DMC)
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

November 2022 DMCC Board Meeting: notable topics: Experience Metrics,  Soldier Fields, Equitable development, Discovery square, Heart of the City



November 11, 2022 : Destination Medical Center (DMC)
Impact Lvl1: Arts & Culture, Diversity and Inclusion, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

November 2022 DMCC Meeting: Featuring Equity Development 



October 01, 2022 : Destination Medical Center (DMC)
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

September 2022 DMCC Board Meeting



September 13, 2022 : DMC Information
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

July 2022 Destination Medical Center Information Sheet.  



June 25, 2022 : May 18, 2022 DMCC Board Meeting
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

May 2022 Proceedings and notable breakouts



February 05, 2022 : Destination Medical Center (DMC) 2022 Reports
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

February 3, 2022

DMCC Board Meeting

City, County, DMC Board Collaborative Session: Featuring Thomas Fisher

 



November 14, 2021 : Destination Medical Center (DMC) 2H 2021 Meetings
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

November 4,  2021

Project Discussion (City of Rochester, EDA: Experience metrics, Business Development, 

Project Updates: A. Heart of the City 27 B. Riverfront Reimagined 29 C. Rapid Transit Corridor Development 31 D. District Energy 33 E. McKnight Foundation Grants

 

September 20211 DMCC Board Meetings information.



May 20, 2021 : Destination Medical Center (DMC) 2021 Meeting Info
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

May 20 and March 23, 2021 DMCC Board Meetings



February 03, 2021 : Destination Medical Center (DMC) Joint Session
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

Feb. 3, 2021 DMC Slide Decks and Recording



November 21, 2020 : November 2020 DMCC Board Meeting
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

(1) November 2020 Board Meeting (2) 5 Year DMC Plan Updates and Covid Effects



November 19, 2020 : Destination Medical Center (DMC) Plan 5 Year Update
Impact Lvl1: Arts & Culture, Economic Development, Pandemic, Transportation, Vision/Identity
Impact Lvl2:

November Newsletter, 5 Year Plan Update draft, webinars on land investments, DMC status and Covid impacts. Reminder to comment on 5 year plan update 



September 26, 2019 : Destination Medical Center (DMC) September 2019
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

September 2019 DMCC Meeting memo about metrics dashboard. 



Back To Top

 

Pinned DMC EDA organization and project reports


. Project Report of BioRochester and MedHub 3.0 : May 27, 2024 : DMC's BioRoch effort to Collaborate with MN MedTech 3.0
Impact Lvl1: CMRC, Diversity and Inclusion, Economic Development, Funding, OpenBeam, STEM, Technology Enablement, Workforce Development
Impact Lvl2:

DMCC Board Updates:

1. May 2024 Status Memo to DMCC Board  

2. Feb 2024 DMCC Board Meeting: Video Clip of Discussion at Feb 1 2024 DMCC Board - DMC part of MedTech 3.0; Memo to DMCC

3. Nov. 2023 Video Clip of Discussion at DMCC Board Meeting about MN MedTech 3.0 Description and Webinar

References: US DEA Tech Hub Awardees 



Project Report of Destination Medical Center (DMC) : May 24, 2024 : 1H 2024 Destination Medical Center
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

Proceedings

May 2024 DMCC Board Meeting and City, County, DMC Joint Meeting

Feb 2024 DMCC Board Meeting



Project Report of Destination Medical Center (DMC) : February 12, 2024 : Destination Medical Center (DMC) Investment Metrics Slow Down Trend
Impact Lvl1: Biotec, Business Process, Economic Development, Housing, Metrics, Sustainability
Impact Lvl2:

Feb 1, 2024 DMCC Board Meeting

Private investment metrics Slide

Video Clip

PB Reporting



Project Report of Destination Medical Center (DMC) : December 13, 2023 : 2H 2023 Destination Medical Center (DMC) Meeting Informaiton
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

November DMCC Meeting Info 

September DMCC Meeting Info

May DMCC Meeting Info 



Project Report of Two Discovery Square : November 30, 2023 : Discovery Square Shared Lab Infastructure
Impact Lvl1: Economic Development, STEM
Impact Lvl2:

A shared lab space for a community of like-minded entrepreneurs associated with one or more academic research partners



Project Report of BioRochester and MedHub 3.0 : October 23, 2023 : CMRC Support of Formation of a BioRochester Consortium
Impact Lvl1: CMRC, Economic Development, Funding, OpenBeam, STEM, Technology Enablement, Workforce Development
Impact Lvl2:

1. October 23, 2023 EDA Tech Hubs Awardees Announcement

2. Video Clip from CMRC August Mtg; CMRC Letters of Support; References: BioRochester Review meeting video; Summary of Draft 3 BioRochester Plan, and Final Grant Submission



Project Report of Destination Medical Center (DMC) : October 01, 2023 : Destination Medical Center 3Q 2023 Reports
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

1. September 2023 DMCC Board Meeting:

2. Meeting Package,

3. Meeting Slides,

4. Video Recording 

5. Breakouts



Project Report of BioRochester and MedHub 3.0 : August 10, 2023 : Rochester MSA Applying for Tech Hubs Grant Review Meeting
Impact Lvl1: CMRC, Diversity and Inclusion, Economic Development, Funding, OpenBeam, STEM, Technology Enablement, Workforce Development
Impact Lvl2:

Video Recording of Draft Review Session



Project Report of Destination Medical Center (DMC) : March 23, 2023 : 1Q 2023 Destination Medical Center (DMC) Reports
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

March 2023 Executive Committee Meeting;

Feb 9 2023 DMCC Board Meeting and City, County, DMC Collaborative Session



Project Report of America's City for Health : February 25, 2023 : Use of "America City for Health" as moniker to attract DMC investment
Impact Lvl1: Business Process, Commitment, Diversity and Inclusion, Governance/Public Policy, Mental Health, Workforce Development
Impact Lvl2:

Feb 2023 Business Development status; Nov. 2021 Presentation to DMCC Board in November 2021 Board Meeting. Focus on attracting more companies coming in.  America City for Health as lead generation asset. 



Project Report of Adminstration of Rochester's 3.12M award from Minnesota Main Street Economic Revitalization Program : December 21, 2022 : Administration of Rochester's 3.12M award from Minnesota Main Street Economic Revitalization Program
Impact Lvl1: Diversity and Inclusion, Economic Development, Entrepreneurship, Funding
Impact Lvl2:

(1) Second Phase Grant; (2) DMC Announces First Recipients of Main Street Grant Funding 30 Businesses ($1.6M) ; (3) Launching of Main Street Grant 



Project Report of Destination Medical Center (DMC) : November 12, 2022 : Destination Medical Center (DMC)
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

November 2022 DMCC Board Meeting: notable topics: Experience Metrics,  Soldier Fields, Equitable development, Discovery square, Heart of the City



Project Report of Destination Medical Center (DMC) : November 11, 2022 : Destination Medical Center (DMC)
Impact Lvl1: Arts & Culture, Diversity and Inclusion, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

November 2022 DMCC Meeting: Featuring Equity Development 



Project Report of DMC Discovery Square : November 11, 2022 : DMC Discovery Square Design Process
Impact Lvl1: Biotec, Diversity and Inclusion, Economic Development, Entrepreneurship, Education
Impact Lvl2:

Discovery Square Status to DMCC November Board Meeting: 6 Elements of Success



Project Report of Destination Medical Center (DMC) : October 01, 2022 : Destination Medical Center (DMC)
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

September 2022 DMCC Board Meeting



Project Report of Destination Medical Center (DMC) : September 13, 2022 : DMC Information
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

July 2022 Destination Medical Center Information Sheet.  



Project Report of Destination Medical Center (DMC) : June 25, 2022 : May 18, 2022 DMCC Board Meeting
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

May 2022 Proceedings and notable breakouts



Project Report of Discovery Walk Co-designing : May 09, 2022 : Community Co-Design Toolkit
Impact Lvl1: Best Practice, Civic Engagement, Diversity and Inclusion, OpenBeam, Vision/Identity
Impact Lvl2:

As a member of the Community for Health Steering Committee and piloting the use of co-designing in the Discovery Walk project, OpenBeam participated in developing the Community Co-Design Toolkit as a guide for other community projects to consider and adopt a co-design process to maximize inclusive engagement. 



Project Report of Destination Medical Center (DMC) : February 05, 2022 : Destination Medical Center (DMC) 2022 Reports
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

February 3, 2022

DMCC Board Meeting

City, County, DMC Board Collaborative Session: Featuring Thomas Fisher

 



Project Report of America's City for Health : January 22, 2022 : ACH 2022 Info Log
Impact Lvl1: Aging, Best Practice, Business Process, Civic Engagement, Commitment, Diversity and Inclusion, Governance/Public Policy, Health, Housing, International, Intelligence, Mental Health, OpenBeam, Sustainability, Technology Enablement, Transportation, Workforce Development
Impact Lvl2:

January 2022 Meeting Review Workgroup purpose (mission, vision, and values) and OpenBeam comments. 



Project Report of Destination Medical Center (DMC) : November 14, 2021 : Destination Medical Center (DMC) 2H 2021 Meetings
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

November 4,  2021

Project Discussion (City of Rochester, EDA: Experience metrics, Business Development, 

Project Updates: A. Heart of the City 27 B. Riverfront Reimagined 29 C. Rapid Transit Corridor Development 31 D. District Energy 33 E. McKnight Foundation Grants

 

September 20211 DMCC Board Meetings information.



Project Report of Discovery Walk Co-designing : May 27, 2021 : Discovery Walk
Impact Lvl1: Arts & Culture, Best Practice, Diversity and Inclusion, Interaction, Recreation & Open Space, Welcoming
Impact Lvl2:

March 2021 DMCC approval for Bid



Project Report of Destination Medical Center (DMC) : May 20, 2021 : Destination Medical Center (DMC) 2021 Meeting Info
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

May 20 and March 23, 2021 DMCC Board Meetings



Project Report of Destination Medical Center (DMC) : February 03, 2021 : Destination Medical Center (DMC) Joint Session
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

Feb. 3, 2021 DMC Slide Decks and Recording



Project Report of Discovery Walk Co-designing : December 10, 2020 : Co-designing of Discovery Walk Concept
Impact Lvl1: Diversity and Inclusion, Health, Recreation & Open Space
Impact Lvl2:

Summary of Co-design of Discovery Walk and Codify the co-design process. 



Project Report of Destination Medical Center (DMC) : November 21, 2020 : November 2020 DMCC Board Meeting
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

(1) November 2020 Board Meeting (2) 5 Year DMC Plan Updates and Covid Effects



Project Report of Destination Medical Center (DMC) : November 19, 2020 : Destination Medical Center (DMC) Plan 5 Year Update
Impact Lvl1: Arts & Culture, Economic Development, Pandemic, Transportation, Vision/Identity
Impact Lvl2:

November Newsletter, 5 Year Plan Update draft, webinars on land investments, DMC status and Covid impacts. Reminder to comment on 5 year plan update 



Project Report of America's City for Health : December 20, 2019 : 2019 Community for Health Workgroup Log
Impact Lvl1: Best Practice, Business Process, Civic Engagement, Health
Impact Lvl2:

DMC EDA initiated Community For Health group effort notes 2018 and 2019 logging of notes and activities. 



Project Report of Destination Medical Center (DMC) : September 26, 2019 : Destination Medical Center (DMC) September 2019
Impact Lvl1: Arts & Culture, Economic Development, Housing, Sustainability, Transportation, Workforce Development, Vision/Identity
Impact Lvl2:

September 2019 DMCC Meeting memo about metrics dashboard. 



Project Report of DMC Dashboard : August 27, 2016 : DMC Dashboard With Data
Impact Lvl1: Best Practice, Economic Development, Metrics, TBD
Impact Lvl2:

In August DMCC Board meeting, the following DMC Dashboard material was presented.



Back To Top

 

Site Information
Project Phase Definitions
The following defines the various project phases:
  1. Available - a product, program or service is in production
  2. Develop - program or application is being developed
  3. Plan - idea is solid, stakeholders are identified, and there is strong commitment to go forward from all parties.
  4. Concept Phase - idea scoped out with enough details to give an early sizing and/or to build a proof of concept
    demonstration
  5. Pre-concept Phase - an early idea or a requirement.
About Beam
  • For the commercial sector, we tend to register startup activities (new companies and new commercial projects) that bring diversification and high-impact opportunities to the area.
  • For the non-profit sector, we wish to shine light on all the organizations and services that otherwise labor under relative obscurity.
  • Our hope is that dmcbeam.org will encourage cross-sector collaborations and creative solutions.

While there are a number of registries in the community, dmcbeam.org's  distinct value is to pilot a database with a data structure and categorizations that answer the questions such as: What organizations or projects/programs in our community that have purported relevance with some of the over-arching focuses put forward by initiatives such as DMC, J2G and Health Improvements?

This database could be used as one of the ways to explore the capacities of the community. If you are someone on an exploratory journey to learn about the greater Rochester community. dmcbeam.org could be an interesting first step.

Links to Beam sub-sites 
Sample of Beam sub-sites: